2026
MV Delivery Substation and MV/LV Transformer Substation Project – MOONY PASTA
As part of the construction of the new MOONY PASTA industrial unit in Bouznika, G.S.A.I carried out a complete medium and low voltage electrical power supply project to ensure energy distribution across the entire industrial site. The project included execution studies, supply, installation, connection, testing and commissioning of a medium voltage delivery substation and an MV/LV transformer substation designed to meet the factory’s production requirements. G.S.A.I also handled the installation of medium voltage switchgear, transformers, main low voltage switchboards, protection equipment, grounding systems, cable trays and electrical connections required for reliable operation. This project provided MOONY PASTA with a modern, reliable, safe and scalable electrical infrastructure, compliant with industrial requirements and ready for future site extensions.